Decmil was awarded a design and construct contract for heavy mobile equipment (HME) infrastructure including:
- HME workshop with in situ crib room and offices
- HME workshop overflow office block & toilet facilities (transportable)
- HME tyre change facility, with transportable office, crib room and ablutions
- HME wash down facility & refuelling facilities
- Hydrocarbon storage facility
- Warehouse – including gas bottle & battery storage, transportable crib room and ablutions
- Bulk lubricant storage
- Oil water separation facility
- Arc gouging facility
- Installation of a potable water treatment plant