Decmil Australia was awarded a contract for the design and construction of a new 2.1ML fuel facility at RAAF Base Learmonth.
The scope of works included:
- 14x 150 kL steel tanks;
- Concrete bunds;
- Offloading (3x) and uploading (2x) bays for triple road trails;
- Pumps and integrated pipework for fuel distribution;
- Fire water system;
- Store and ablution;
- Electrical works;
- Demolition of existing tanks and remediation of site